Everything about Cast in Situ Piles in Bangladesh
As noticed from your figure below, constant auger is utilized to drill the borehole, elevate up drilled soil, and pour concrete while the auger is moved up. Subsequently, the borehole won't need casing or hydrostatic strain to prevent harm to the borehole wall.We have now structural engineers who will ensure the integrity and security of bored cast